Tuesday, July 24, 2012

The Shop Part II

     Time to do some demolition. Dale at Cornerstone Construction got the three walls up and rough framed two windows in the back building. The back wall on the old garage was still attached so Bret and I smacked that thing with some hammers. The old half was built pretty shady. The mezzanine was barely nailed to the studs and was basically hanging from the ceiling. (Shouldn't have put those motors up there, ooops.) There is a bit of a sag in the old roof line so that needs some attention. We did find the remnants of a squirrel, I think its a squirrel. That was pretty sweet.
     I plan on replacing the studs because they are 1x3, they need to match depths inside and out with the new side which are 2x4. The wood siding underneath the aluminum siding is coming off this week and we'll sheath it with OSB and Tyvek wrap. Ill snap some pics of the finished shell before Mike from Mike's Electric puts the juice to it.
     Side note: The CNC Plasma is ordered. A fully loaded Plasma Cam will be on its way soon!
     





Scott the squirrel.
    

2 comments:

  1. Scott is awesome...that is all.

    ReplyDelete
  2. Scott would make an interesting decoration for the new shop!

    ReplyDelete